Arc Flash & Short Circuit Coordination Studies

MEP/FP Design
Technology
Design
Energy &
Sustainability
Commissioning
BIM/VDC
Advisory
Arc Flash and
Short Circuit
Coordination
Studies
Computational
Fluid Dynamics
Modeling

AHA has professional expertise to perform electrical power systems coordination studies on most the complex and high-performance buildings.

AHA’s Team of highly experienced electrical engineering professionals have the expertise and capabilities to perform electrical power systems arc flash and short-circuit coordination studies for facilities ranging from academic buildings on a medium voltage campus distribution system, to high-rise core-and-shell lab/office buildings in an urban utility network vault environment, to hyper-scale data centers on dedicated primary metered utility services, as well as small to large electrical power systems in between. Our team’s analysis leads to recommendations that allow our clients to increase operational reliability, and as importantly, personal and equipment safety.

Service Leaders

Jesse Foley
Jesse Foley
Jesse Foley

Jesse Foley, PE, LEED AP

Managing Partner

Location: Atlanta, GA

Experience: 20 Years

Joined AHA: 2010

Fun Facts:

  • My favorite quality in a person... Reliability
  • I am motivated by... Winning and Growing
  • My top bucket list item... Ski the alps
Bruce Swanton
Bruce Swanton
Bruce Swanton

Bruce Swanton, PE

Partner | Electrical

Location: Boston, MA

Experience: 40 Years

Joined AHA: 2000

Fun Facts:

  • My greatest inspiration... Apollo Space Program
  • I am motivated by... Positive reinforcement
  • My passion project beyond work... Stacking my gold bullion
Harvard University Faculty Club
Harvard University Faculty Club
Cambridge, MA
Harvard University Faculty Club
Harvard University Faculty Club
Harvard University Faculty Club

Harvard University Faculty Club
Cambridge, MA

This renovation modernized this historic 1920s building. The main kitchen was updated, while the refurbished dining rooms offer seating for approximately 300 guests. The meeting, conference, function, and hospitality spaces were upgrades, while new private and open office areas were created.

AHA provided Mechanical, Electrical and Plumbing Design, Feasibility Study, an Arc Flash Study, and Utility Incentive Assistance services to met Harvard’s University Green Building Standards (Dec 2014) Tier 3 Systems Upgrades: Limited Scope Projects with Energy and GHG Impact. The design included two new mechanical rooms, one of which merged AHUs to eliminate several existing units, and expanded a third mechanical room. Overall 17 single zone, constant volume AHU’s were consolidated into 4 VAV AHU’s, system variability/control for dynamically occupied spaces improved energy efficiency, and the quantity of equipment needed to operate and maintain the building was reduced.

Northstar Project & Real Estate services, the University’s Owner’s Project Manager, engaged AHA to provide Advisory services, a feasibility study investigated the most appropriate solution to upgrade the building’s HVAC system.

Arc Flash Representative Projects
Arc Flash Representative Projects
Arc Flash Representative Projects

Arc Flash Representative Projects

Boston University 700 Commonwealth Avenue
Boston University 915 Commonwealth Avenue
Boston University Sleeper Hall
Boston University Claflin Hall
Boston University Rich Hall

PayPal PHX01

eBay SLC01

Ascent PHX04
Ascent PHX01

Arc Services

  • Arc Flash Studies
  • Short-Circuit Coordination Studies
  • Power Device Coordination Studies
  • Electrical Engineering Services
  • Electrical Distribution Design Services

Representative Clients

  • Boston University
  • eBay
  • Harvard University
  • NTT Data Centers
  • PayPal
Scroll to Top